Entrades

Nowmma (Mauguio)

LOCATION
Mauguio (France) 43°36’02.3″N 4°01’01.9″E

TREATMENT TECHNOLOGIES

Treatment
Post treatement desinfection

TRANSPORT AND STORAGE
Transport and storage indicators:
WWTP/WRP capacity 24.000 population equivalent
Length of the network 150 m
8 m3
Direct reuse
Domestic WW
Confidential data but between A and C quality (french regulation) according to the treatment and the storage
Grid, sieving, defating/desanding, aerated activated sludge, lagoons
No numerical data available
Chlorination, sand filtration, ultra filtration and UV
No numerical data available
Storage capacity
Pilot projet – NOWMMA Maugio (France)
NOWMMA
R&D project that aims to develop and test wastewater treatment and irrigation chains adapted to wastewater reuse (irrigation and street cleaning)
3 irrigation points

MAIN COSTS

Explain which are the main costs specific to water reuse and how is their frequency (transport, additional treatment…)
Cost of the project (until putting into operation) 2,8 M€ over 3 years

BENEFITS

Environmental benefits
Economical benefits
Identify the most cost effective wastewater reuse chains (treatment and irrigation technologies) to match water quality and uses (irrigation, regulation,…)
Social benefits

DISADVANTATGES/LIMITS
High costs of treatment for the tested desinfection solutions
Main Costs indicators:
a) Investments
Energy expenses
Consumables expenses
Maintenance expenses
b) charges
Limit the TWW disposal (before desinfection) into a pond (“Etang de l’Or”)

Waste water reuse on forestry plantation (Nègrepelisse)

Partner: local council community Terrasses and Valleée de l’Aveyron (CCTVA)

 

Project dates: in service since January 2014

 

Site (region/city or town): department*  of Tarn et Garonne, municipality of Nègrepelisse

 

Scale level (national, regional, local): the area concerned by this treatment plant is the northeast of department

 

Use/s of the reclaimed water  (industrial reuse / green areas reuse/ agriculture reuse / street cleaning reuse / landscape reuse / others): agricultural end landscape reuse

 

Short Description of the existing project:

CCTVA operates Negrepelisse sludge treatment unit. Sludge is treated by several filters. Between May and October, the treatment plant provides water to a forestry plantation. This operating increases the treatment of effluents and produce firewood for the communal heat production plant. An experimental monitoring has been initiated in 2014 for 3 years, to assess the performances of sludge treatment, tree growth and performance of the irrigation system.

Specificities and data (technologies, water quality, flows, etc.): 11 000 m3 of sludge could be treated on 8 filters of common reed (total surface: 2600m²). The solid part stay on the surface and the liquid phase pass through the sand layer, where is operating the microbiologic treatment. In summer time, treated waste water is stocked, then filtered, before to be reuse for watering 3,2 hectares of forestry plantation composed of poplar and eucalyptus. In 2014, 6500 m3 of sludge were treated and almost 5 500 m3 of water were reuse on plantation.
Is this the best application for this water? Why?

This is the best way to reuse waste water in accordance with French regulation. The reuse allows decreasing discharge impact in the river, and increasing the growth of trees which means a better way to produce energy.

In the future, is there any new expected use for this water reclamation project?

There isn’t other use expected because of regulation, but it should be interesting to think about cleaning street.

How was the project funded?

The project is born because of lack of sludge treatment plant in north east of department. This situation was source of several issues such as outlawed discharge, difficulties for monitoring sludge spreading plan, transports over long distance.

Implementation costs: the cost operation is about 1,9 million euros.

  • Property purchase:4%
  • Treatment:79%
  • Irrigation:14%
  • Experimental equipment: 3%
Legislations or other regulatory measures which affected the project:

Reuse waste water has been allowed for testing reason and only if the following conditions were respected:

  • the plantation must be inaccessible for public,
  • the irrigation system must avoid spray,
  • the environmental monitoring (groundwater, surface water)

 

Stakeholders

Actor What is/was their role?
Adour Garonne Water Agency Experimental and financial partner
CCTVA Treatment plant operator
DDT Direction Départementale des Territoires (administration/régulation)
FCBA France Cellulose Bois Ameublement (Experimental partner for growth of trees monitoring
IRSTEA Institut national de Recherche en Sciences et Technologies pour l’Environnement et l’Agriculture (national research agency) Experimental partner for sludge treatment and irrigation assessment
SATESE Service d’Assistance Technique à l’Exploitation des Stations d’Epuration

Experimental partner for sludge treatment assessment

SDD Syndicat Départemental des Déchets de Tarn et Garonne – Treatment plant owner

 

Innovative aspects (existing and future)

The innovative aspect concerned :

  • The sludge treatment using common reed, on this scale (11 000m3/year)
  • The reuse of water coming from sludge treatment ;
  • The way to provide water to the plantation (microsprinkling and ajutage)
Benefits (social, environmental and economic aspects)

The social benefits haven’t been clearly identified. At the beginning, neighborhood was quiet anxious. He scared mainly of smell coming from sludge. Now, after one year operating, we have never been alerted about any smell production. The treatment plant and water reuse seem well accepted by neighborhood. We can note that the few people who know this project are quiet proud to live on a dynamic territory.

The reuse avoids impact of discharge at the summer time, period where the river is the most sensitive.

About economics aspects, water reuse signifies more investment (10 to 12% of total cost.) The cost of exploitation is around 5 000 euros per years and includes monitoring and energy consumption. The finality of plantation is to provide fire wood for the communal heat production plant. The production is expected between 15 and 20 tonnes dry matter/hectare after 1 years, which means the biomass production could be 1,5 to 2 higher than that is usually observed on these species without irrigation.

Reuse reduces the cost of irrigation which is around 0,5 €/m3.

Barriers

The mains obstacles to take account are :

  • Regulation’s obligations ;
  • Acceptation by local people;
  • The cost of investment.

 

ACTIONS TO DO IN ALERA –to be described carefully-

CCTVA will provide technical data about exploitation (problems, costs, first tendency about irrigation and treatment monitoring, etc.)

CCTVA is in deal with Ecofilae to discuss about the meeting in France (date and place.)

CCTVA is communicating about Alera project on his web site (site Internet)

 

 

 

Irrialt’eau in Gruissan (Languedoc-Roussillon)

Partner:AQUADOC ; SCV Cave de Gruissan ; Véolia Eau ; Véolia Environnement ; Grand Narbonne ; INRA ; Unité expérimentale de Pech Rouge ; LBE Narbonne
Project dates:2013 to 2015
Site (region/city or town):Gruissan city in Languedoc-Roussillon
Scale level (national, regional, local):Local level
Use/s of the reclaimed water:Agricultural use – Vineyards irrigation
Short Description of the existing project:A pilot project for domestic treated wastewater reuse is implemented in Guissan nearby the city of Narbonne. Water is used for 1.5 Ha vineyards irrigation in the experimental center of INRA.Treated wastewater comes from the Narbonne wastewater treatment plant.This project is a small-scale pilot and aims at following micro-pollutants contents in grapes and wine.

If results are encouraging, more wine-growers are interested in reusing treated wastewater.

Specificities and data (technologies, water quality, flows, etc.):Water treatmentWater quality B (French regulation) : pre-filtration + UV and chlorination (slight)Water quality C (French regulation) : pre-filtration + chlorination
Is this the best application for this water? Why?Water is rejected into the sea if not reuseIn the future, is there any new expected use for this water reclamation project?More farmers may join the project in the future as there is enough water for 50 Ha of vineyards.
How was the project funded?Languedoc Roussillon region funded part of the project 
Legislations or other regulatory measures which affected the project:The project had to comply with the specific French regulation (in 2010 the 2nd of august revised in 2014 the 25th of june) on wastewater reuse for irrigation purposes.This regulation sets standards for water quality.
Stakeholders

Stakeholder What is/was their role?
AQUADOC Irrigation equipment
SCV Cave de Gruissan Local winery
Véolia Eau Environnment Project leader – Water treatment
Grand Narbonne Owner of the wastewater treatment plant
Unité expérimentale de Pech Rouge Experimental tests
LBE Narbonne Experimental tests

 

Innovative aspects (existing and future)First project of wastewater reuse for vineyards irrigation in FranceFirst wastewater reuse project to follow micro pollutants

 

Benefits (social, environmental and economic aspects)Improve technics and risks mitigation methods for wastewater reuseEncourage social acceptance of wastewater reuse

 

Improving vineyards yields through irrigation in a water scarce area

Barriers Limited social acceptance for wine consumersEconomic profitability of the project at large scale needs to be demonstrated

 

 

Legal framework of water reuse

Spain

France